Custom Home Builder Contract Checklist Texas

George Roddy • November 23, 2026

A custom home builder contract checklist Texas buyers can use to review scope, design duties, price, and deadlines before signing.

A couple reviewing printed home plans and a contract at a kitchen table

Use this custom home builder contract checklist texas buyers rely on before a design agreement or a construction contract. It is the short list of questions to answer before you sign. The design agreement sets who draws the plans, what those plans cover, and when you must decide. The construction contract sets the work, the price, and how you pay. If either document is vague, the surprise shows up later as a change order, a delayed start, or a bill you did not expect.

Request a consultation before you sign, and bring the draft with you.

ROSÖ Homes is a design-build custom home builder in the Dallas-Fort Worth area. The company writes a fixed price before groundbreaking, includes design in that process, and builds on a buyer's lot or in a ROSÖ community. If you are still choosing the builder, start with our builder selection guidance, then come back to the contract. This checklist is not a substitute for your own lawyer or lender. It is the set of questions we walk through so the written deal matches the home you think you are buying.

What a design agreement covers before the build contract

Many buyers treat the design agreement as paperwork on the way to the real contract. It is the document that decides what the later contract can even price. Ask these questions before you initial it.

  • Who produces the plans: the builder's in-house team, an architect you hire, or both? ROSÖ Homes can design the home in house or work from plans your own architect already drew.
  • What do you owe if you stop after design and never build? A design fee, a credit toward construction, or nothing until you approve a price?
  • Which drawings are included: floor plan, elevations, electrical, and structural, or only a concept you still have to engineer?
  • How many revision rounds are included, and what starts a paid change?
  • When does the design agreement end and the construction contract begin? You should not be asked to break ground on a concept sketch.

Bring pictures, a rough sketch, and a budget to the first meeting. A useful design agreement names the lot, the approximate size, and the decisions still open. It should also say that site facts can change the plan. A floodplain, a septic field, an easement, or a long utility run can force a redesign before anyone prices lumber. Our lot feasibility questions cover the site checks that belong in that conversation, not inside the contract clauses themselves.

Ask who attends the design meetings and how decisions get recorded. A meeting note that never makes it into the drawings is how two people leave the room with two different houses. If you want a fuller look at how those working sessions run, read how custom home planning meetings keep selections and site questions in one place.

Custom home builder contract checklist Texas buyers use for scope

Texas law tells an original contractor to give the owner a written disclosure before a residential construction contract is signed. Texas Property Code section 53.255 says that agreement should cover four things. Those are a description of the work, the required or estimated completion time, the cost or how the cost will be determined, and the procedure and method of payment. The same disclosure says an oral promise that never lands in the written agreement may not be enforceable. Read that as a working rule: if it matters, it has to be on the page.

Use that statute as the spine of your custom home builder contract checklist for Texas, then go one level deeper on a custom home:

  • Work description. Does the contract list the home, the garage, covered porches, flatwork, and utility connections from the meter or the street to the house? "Standard features" only helps if a specification sheet is attached.
  • Plans incorporated by reference. Name the drawing set, the date, and the revision. A contract that says "plans to be provided" has not described the work yet.
  • Allowances versus specified products. An allowance is a placeholder dollar amount. Ask which lines are still allowances and which products are already selected. Our guide to Texas custom home allowances is the place to compare those lines. Do not re-trade the whole allowance method inside the contract review.
  • Site work boundaries. Who pays for rock, fill, a longer driveway, or a septic system the bid did not assume? Say what is excluded in the same sentence as what is included.
  • Completion time. The statute asks for a required or estimated time. Ask what starts the clock, which weather or owner delays pause it, and what "complete" means for final payment.

ROSÖ Homes prices by total area under roof, not by heated square feet alone. Garage and covered patio count. A contract that quotes a living-area figure and stays silent on those roofs is not describing the same house. Ask for the area basis in writing next to the price.

Who owns design decisions, and when you must make them

Design responsibility is where custom-home contracts go quiet and later get expensive. The question is not only who draws. It is who is allowed to decide, by when, and what happens if you miss the date.

Ask for a decision calendar tied to the construction sequence. Structural options, window packages, and plumbing locations usually have to freeze before framing. Finish selections can wait longer, but not forever. A contract that says "owner will select in a timely manner" does not tell you the date that protects the schedule.

Then separate three roles that people often blend:

  • Designer. Produces the drawings you approve. If you bring an outside architect, the contract should say the builder builds those drawings and does not redesign them unless you ask.
  • Builder. Prices the approved drawings, pulls permits, hires the trades, and tells you when a selection is about to miss a lead time.
  • Owner. Approves the drawings, makes selections by the dates in the calendar, and signs any change that alters price or time.

Ask what "approval" looks like. Initials on a PDF, an email, or a portal click should all count as the same kind of record. Ask who can approve if you and a spouse or a business partner disagree. One named approver prevents a trade from taking instructions from whoever answered the phone.

Also ask which engineering the design fee includes. A pretty elevation is not a foundation plan. Structural, energy, and drainage drawings have to exist before a city or county will let you build, and someone has to pay for them. If the lot needs a septic design or a fire-access review, that scope should be named as included or billed separately, not discovered after you sign.

Price, allowances, and what the number does not cover

The third item in the Texas disclosure is the cost of the work or how that cost will be determined. On a custom home, that is either a fixed price or a cost-plus formula. Those are different contracts. A fixed price tells you the number before groundbreaking. Cost-plus tells you the method, then the number follows the invoices. If you are choosing between those models, use the comparison of fixed-price versus cost-plus pricing rather than treating this checklist as the pricing guide.

Whichever model you are offered, the contract should still answer these questions:

  • Is the price tied to a dated specification, or to a verbal "builder grade"?
  • Which items sit in allowances, and what happens when your selection costs more or less?
  • Are building permits, impact fees, utility tap fees, and builder's risk insurance inside the price? Builder's risk insurance is its own decision. Confirm who buys the policy and who is named on it.
  • Is there a contingency, and who controls it? A contingency you cannot see is not a contingency. It is a blank check. The separate note on a contingency budget explains how buyers keep that line visible.
  • What is excluded on purpose: land cost, landscaping beyond grading, window coverings, appliances, or a pool?

ROSÖ Homes states a fixed price before groundbreaking and describes the construction price as at least 10 percent below other DFW custom builders with the same features. Treat both as statements to verify in the draft in front of you, not as a reason to skip the allowance and exclusion lines. Published square-foot talk on the website has used more than one rate over time. The number that binds you is the one in the contract for your plans, not a rate you saw on a page.

The payment method belongs in the same section. Section 53.255 specifically asks for the procedure and method of payment, including how final payment is conditioned. Ask when each payment is due, what has to be finished first, and what you may withhold if a listed item is open. For how milestone schedules usually read, see the custom home payment schedule guide. This checklist only checks that your contract actually has one.

ROSÖ Homes is the builder, not the lender. Interest, draw releases, and rate locks come from your lender's documents. If you are financing the build, ask your lender for the closing package at least one business day before you sign it. The same Texas disclosure says you are entitled to that review time unless a real emergency gives you a reason to waive it. Our page on new construction financing options is where to line the loan up with the contract. Do not expect the builder agreement to set your rate.

Changes, delays, and the warranty you can actually read

A clean contract still needs a way to change. You will think of something after the plans are priced. The question is whether that change has a written path.

Ask to see the change-order form before you sign the contract. A usable form has four fields: the description, the price difference, the time difference, and both signatures. Work that starts on a text message is how a fixed price stops being fixed. Ask what happens if you do not answer a selection request by the deadline. Some contracts let the builder pick a standard product so the schedule can move. That is fair only if the contract names the standard and the deadline.

Ask the same clarity of the schedule. ROSÖ Homes describes a 120-day construction timeline from groundbreaking and also tells site visitors the home is built in 180 days or less once the foundation is poured. Those are not the same sentence. Your contract should pick the milestone that starts the clock and the milestone that stops it. Weather, owner delays, and change orders should say whether they add days. A promise that lives only in a sales conversation is the oral promise section 53.255 warns you to write down.

Warranty language is the other place buyers skim. ROSÖ Homes describes a 10-year structural warranty backed by 2-10 Home Buyers Warranty. Confirm three things in the packet you receive: what "structural" covers, what workmanship period is separate from that 10 years, and how you file a claim. A brochure is not the warranty. The certificate and the exclusions are. For the broader Texas new-home warranty picture, the new-home warranty guide is the companion piece. Your contract should point at the actual warranty document, not a slogan.

Two more clauses are worth a slow read. First, dispute steps: a meeting, then mediation, before anyone files suit. Second, lien exposure. The Texas disclosure exists partly because unpaid subcontractors and suppliers can file liens. Ask for the list of subcontractors and suppliers the statute says you should receive before work starts, and ask how your payments are tied to lien releases at the end. That is a question for your lawyer if the release form is hard to read. It is still a question to ask before you sign, not after a lien notice arrives.

A one-page review you can take into the meeting

Print this list and mark each line yes, no, or ask. If a line is no, do not sign that day. Work through the lines in this order.

  1. Confirm the design agreement names the designer, the revision count, and the fee if you never build.
  2. Confirm the construction contract attaches dated plans and a specification.
  3. Mark every remaining line yes, no, or ask before you leave the meeting.
  • The design agreement names who draws the plans, how many revisions you get, and what you pay if you do not build.
  • The construction contract attaches a dated plan set and a specification, not a promise to design it later.
  • The work list includes structure, garage, covered areas, and the utility work you think you are buying.
  • Allowances are listed with amounts, and everything else is a specified product.
  • The price is a fixed number or a formula you can recalculate, and exclusions are listed beside it.
  • Permits, tap fees, and builder's risk are either inside the price or listed as owner costs.
  • The payment schedule states the amount, the work required before each payment, and the condition for the last payment.
  • A decision calendar gives dates for structural choices and finish selections.
  • The change-order form records price and time, and unsigned work is not authorized.
  • Start and finish milestones are defined, including which delays add days.
  • Warranty documents name the structural term, the workmanship term, and the claim path.
  • Every promise you are relying on is written. Nothing important is "we'll take care of it."

That is the whole custom home builder contract checklist for Texas. It will not pick your floor plan. It will show you whether the paper matches the plan.

If you are still choosing who should hand you that paper, use the Fort Worth checklist for vetting home builders for reputation, references, and fit. This page starts after you have a builder and a draft.

Bring the draft design agreement and construction contract to a ROSÖ Homes consult. We will walk the scope, the design responsibilities, and the price with you before anyone is asked to sign. Call 972-945-7676 or use the contact form.

Frequently asked questions

What should a Texas custom home contract include?

Texas Property Code section 53.255 says the written agreement should cover the work, the required or estimated completion time, and the cost. It should also explain how you pay, including final payment. For a custom home, also attach the plans, the specification, the allowance list, and the change-order form.

Is a design agreement the same as a construction contract?

No. The design agreement covers drawings, revisions, and what you owe if you stop before building. The construction contract covers the build itself: scope, price, schedule, and payment. You should know the price of the home you approved before you authorize groundbreaking.

What if the builder promised something that is not in the contract?

The Texas disclosure says an oral promise that is not in the written agreement may not be enforceable. Ask for every promise you are counting on, including timeline and price, to be added before you sign.

Does ROSÖ Homes write the loan or set the interest rate?

No. ROSÖ Homes is the builder. Your lender sets the loan terms, the interest, and the draw rules. The builder contract should still state the construction price and the payment schedule so you can hand both to that lender.

Should a lawyer read the contract?

Yes, if any clause is unclear. The state disclosure says you are entitled to have your own attorney review the documents. Use this checklist to find the gaps. Use the lawyer to interpret the language.

A couple reviews custom home plans at a table inside a bright new home
By George Roddy • November 20, 2026
See how to compare new and existing home costs in DFW, from land and included features to repairs, financing, and the scope behind a builder’s price.
Homeowners reviewing custom home plans and pricing with a builder at a table
By George Roddy • November 19, 2026
Learn what to ask about custom home consultation fees, scope, plans, and budget in DFW before comparing builders or requesting a construction quote.
A newly built Texas home with a homeowner reviewing documents at the kitchen island
By George Roddy • November 18, 2026
Learn what a home warranty may cover, how it differs from insurance and a builder warranty, and what Texas buyers should check before choosing coverage.
A couple reviewing custom home plans with a builder on a North Texas lot
By George Roddy • November 13, 2026
Construction loan down payment custom home Texas: how cash, land equity, and your builder contract shape the amount. Your lender sets it.
A couple reviewing custom home plans and financing paperwork at a table
By George Roddy • November 13, 2026
Learn how construction loan rate locks work, what timelines and fees to ask about, and how to coordinate lender terms with a Texas custom-home build.
A couple reviewing custom home plans and financing paperwork at a table
By George Roddy • November 13, 2026
Learn how construction loan rate locks work, what timelines and fees to ask about, and how to coordinate lender terms with a Texas custom-home build.
Homeowners and a builder reviewing a custom home payment schedule and plans
By George Roddy • November 12, 2026
Learn how to read a custom home payment schedule, compare milestones, and coordinate your builder contract with a lender’s separate draw process.
A couple reviewing custom home plans and finish selections at a table
By George Roddy • November 11, 2026
Learn how custom home allowances work in Texas, what to verify in a builder’s proposal, and how to compare allowances with fixed-price selections.
Homeowners and a builder reviewing plans at a custom home construction site in North Texas
By George Roddy • November 10, 2026
Learn how often to meet with a custom home builder, what to cover at each check-in, and how to keep decisions, site visits, and next steps organized.
Texas homeowners reviewing custom home plans and a budget worksheet at a table
By George Roddy • November 9, 2026
Learn how to plan a custom-home contingency budget in Texas by separating contract scope, lot questions, owner choices, and lender requirements.